High Speed Line

2007
HIGH SPEED LINE ANKARA-ESKISEHIR 1 X 25KV

HIGH SPEED LINE ANKARA-ESKISEHIR 1 X 25KV

Distributed Control System, SCADA, Protection Manager AC and DC Power and Interface IEC-60870-5-104 with Control Center. Total Scope: 4 Traction Substations and 4 Neutral Zones.

2016
HIGH SPEED RAILWAY MEDINA DEL CAMPO-SALAMANCA (SPAIN) 2X25KV

HIGH SPEED RAILWAY MEDINA DEL CAMPO-SALAMANCA (SPAIN) 2X25KV

Distributed Control System based on IEC 61850 protocol, SCADA, Calculation and Simulation of protections Selectivity IEC 61850 (Differential Protection, Distance Protection, Transformer Protection…) and Interface IEC 60870-5-104 to the Control Center.

Total Scope: 1 Substation, 2 Section Post and 2 Paralleling Post

2014
HIGH SPEED RAILWAY VALLADOLID (SPAIN) 2X25KV

HIGH SPEED RAILWAY VALLADOLID (SPAIN) 2X25KV

Distributed Control System based on IEC 61850 protocol, SCADA, Calculation and Simulation of protections Selectivity IEC 61850 (Differential Protection, Distance Protection, Transformer Protection…) and Interface IEC 60870-5-104 to the Control Center.

Total Scope: 1 Substation

2013
HIGH SPEED RAILWAY BARCELONA-FIGUERAS (SPAIN) 2X25KV LAV

HIGH SPEED RAILWAY BARCELONA-FIGUERAS (SPAIN) 2X25KV LAV

Distributed Control System based on IEC 61850 protocol, SCADA, Calculation and Simulation of protections Selectivity IEC 61850 (Differential Protection, Distance Protection, Transformer Protection…) and Interface IEC 60870-5-104 to the Control Center.

Total Scope: 4 Substation, 2 Section Post and 8 Paralleling Post

2011
HIGH SPEED RAILWAY ORENSE-SANTIAGO DE COMPOSTELA (SPAIN) 2X25KV

HIGH SPEED RAILWAY ORENSE-SANTIAGO DE COMPOSTELA (SPAIN) 2X25KV

Distributed Control System for catenary isolators, SCADA, and Interface IEC 60870-5-104 to the Control Center. Total Scope: 55 Local Operator Station for Catenary Isolators.

2011
HIGH SPEED RAILWAY BYPASS SEVILLA-MADRID-BARCELONA (SPAIN) 2X25KV

HIGH SPEED RAILWAY BYPASS SEVILLA-MADRID-BARCELONA (SPAIN) 2X25KV

Distributed Control System for catenary isolators, SCADA, and Interface IEC 60870-5-104 to the Control Center. Total Scope: 1 Local Operator Station for Catenary Isolators

2010
HIGH SPEED RAILWAY MADRID-SEVILLA (SPAIN) 1X25KV  WORKSHOP SANTA CATALINA II-MADRID

HIGH SPEED RAILWAY MADRID-SEVILLA (SPAIN) 1X25KV WORKSHOP SANTA CATALINA II-MADRID

Command and Control System, SCADA and Interface IEC 60870-5-104 to the Control Center

Total Scope: 1 workshop

2009
HIGH SPEED RAILWAY MADRID-SEVILLA (SPAIN) 1X25KV

HIGH SPEED RAILWAY MADRID-SEVILLA (SPAIN) 1X25KV

Distributed Control System, SCADA, Calculation and Simulation of protections Selectivity (Differential Protection, Distance Protection, Transformer Protection…) and Interface IEC 60870-5-104 to the Control Center.

Total Scope: 13 Substations and 29 Technical Buildings

2009
HIGH SPEED RAILWAY MADRID-SEVILLA (SPAIN) 1X25KV AND MADRID-VALENCIA (SPAIN) 2X25KV SWITCH POINT HEATING

HIGH SPEED RAILWAY MADRID-SEVILLA (SPAIN) 1X25KV AND MADRID-VALENCIA (SPAIN) 2X25KV SWITCH POINT HEATING

Control System of heaters for switch points, SCADA and Interface IEC 60870-5-104 to the Control Center.

2007
HIGH SPEED RAILWAY MADRID-SEVILLA 1X25KV

HIGH SPEED RAILWAY MADRID-SEVILLA 1X25KV

Distributed Control System, SCADA, Calculation and Simulation of protections Selectivity (Differential Protection, Distance Protection, Transformer Protection…) and Interface IEC 60870-5-104 to the Control Center.

Total Scope: 13 Substations and 29 Technical Buildings

2003-2016
HIGH SPEED RAILWAY: MADRID-SEVILLA · CÓRDOBA-MÁLAGA ·BARCELONA-FRONTERA FRANCESA · MADRID-VALENCIA · ALBACETE-ALICANTE · MEDINA DEL CAMPO-SALAMANCA · ORENSE-SANTIAGO · VIGO-LA CORUÑA

HIGH SPEED RAILWAY: MADRID-SEVILLA · CÓRDOBA-MÁLAGA ·BARCELONA-FRONTERA FRANCESA · MADRID-VALENCIA · ALBACETE-ALICANTE · MEDINA DEL CAMPO-SALAMANCA · ORENSE-SANTIAGO · VIGO-LA CORUÑA

Energy Quality Measurement System, EN 50160-EN 50163 SICA software

Underground

2016
SCADA CONTROL CENTER FOR ENERGY AND FACILITIES

SCADA CONTROL CENTER FOR ENERGY AND FACILITIES

Design and Development, Integration, Configuration and Commissioning of the Control center of the electric installations (Substations, Transformers Stations, and Catenary Isolators) and mechanical installations (Elevators, escalators, HVAC, pumps…)

2006-2016
TRACTION SUBSTATION LINE 9 30KVAC/1500VDC

TRACTION SUBSTATION LINE 9 30KVAC/1500VDC

Distributed Control System, SCADA, Protection Manager AC/DC Power and Interface IEC 60870-5-104 to the Control Center.

Total Scope: 18 Substations

2015
SUBSTATION PACO DE LUCIA LINE 9 1500VDC

SUBSTATION PACO DE LUCIA LINE 9 1500VDC

Manager AC/DC Power and Interface IEC 60870-5-104 to the Control Center.

Total Scope: 1 Substation

2006-2015
TRANSFORMER STATION LINE 9

TRANSFORMER STATION LINE 9

Distributed Control System, SCADA, Protection Manager AC/DC Power and Interface IEC 60870-5-104 to the Control Center.

Total Scope: 110 Transformer Stations

2004-2012
SUBSTATIONS 15KVAC/750VDC LINE 1, 2 3 AND 4 TRAM ALICANTE-DENIA

SUBSTATIONS 15KVAC/750VDC LINE 1, 2 3 AND 4 TRAM ALICANTE-DENIA

Distributed Control System, SCADA and Interface IEC 60870-5-104 to the Control Center.

Total Scope: 12 Substations

2013
TRANSFORMERS STATIONS LINE 2 METRO SANTO DOMINGO

TRANSFORMERS STATIONS LINE 2 METRO SANTO DOMINGO

Distributed Control System, SCADA and Interface IEC 60870-5-104 to the Control Center.

Total Scope: 14 Transformer Stations

2012
SUBESTATION SACEDAL LINE 9 1500VDC

SUBESTATION SACEDAL LINE 9 1500VDC

Distributed Control System, SCADA, Protection Manager AC/DC Power and Interface IEC 60870-5-104 to the Control Center.

Total Scope: 1 Substation

2004-2012
TRANSFORMER STATION 15/0,4KV LINE 1, 2 3 AND 4 TRAM ALICANTE-DENIA

TRANSFORMER STATION 15/0,4KV LINE 1, 2 3 AND 4 TRAM ALICANTE-DENIA

Distributed Control System, SCADA and Interface IEC 60870-5-104 to the Control Center.

Total Scope: 12 Substations

2012
LOCAL POST CATENARY ISOLATORS LINE 1, 2 3 AND 4 TRAM ALICANTE-DENIA

LOCAL POST CATENARY ISOLATORS LINE 1, 2 3 AND 4 TRAM ALICANTE-DENIA

Distributed Control System, SCADA and Interface IEC 60870-5-104 to the Control Center.

Total Scope: 12 Local Post Catenary Isolators

2011
SUBESTATION PRINCIPE PIO LINE 10 1500VDC

SUBESTATION PRINCIPE PIO LINE 10 1500VDC

Distributed Control System, SCADA, Protection Manager AC/DC Power and Interface IEC 60870-5-104 to the Control Center.

Total Scope: 1 Substation

2011
SUBSTATION ZONA FRANCA AND SAGRERA LINE 9 230/30KV

SUBSTATION ZONA FRANCA AND SAGRERA LINE 9 230/30KV

Distributed Control System, SCADA, Protection Manager AC/DC Power and Interface IEC 60870-5-104 to the Control Center.

Total Scope: 2 Substations

2011
SUBSTATION BACKUP ZONA FRANCA AND SAGRERA LINE 9 25/30KV

SUBSTATION BACKUP ZONA FRANCA AND SAGRERA LINE 9 25/30KV

Distributed Control System, SCADA, Protection Manager AC/DC Power and Interface IEC 60870-5-104 to the Control Center.

Total Scope: 2 Substations

2007-2010
SUBSTATIONS EXPANSION PLAN 2007-2010

SUBSTATIONS EXPANSION PLAN 2007-2010

Distributed Control System, SCADA, Protection Manager AC/DC Power and Interface IEC 60870-5-104 to the Control Center.

Total Scope: 10 Substations

2009
TRANSFORMERS STATIONS LINE 1 METRO SANTO DOMINGO

TRANSFORMERS STATIONS LINE 1 METRO SANTO DOMINGO

Distributed Control System, SCADA and Interface IEC 60870-5-104 to the Control Center.

Total Scope: 18 Transformer Stations

2006
ENERGY MANAGEMENT SYSTEM (EMS)

ENERGY MANAGEMENT SYSTEM (EMS)

Design and Development, Integration, Configuration and Commissioning of Energy Management System.

2006
SUBSTATION SANT GENIS LINE 3 1500VDC

SUBSTATION SANT GENIS LINE 3 1500VDC

Distributed Control System, SCADA, Protection Manager AC/DC Power and Interface IEC 60870-5-104 to the Control Center.

Total Scope: 1 Substation

2006
SUBSTATION PLAZA CATALUÑA LINE 3 1500VDC

SUBSTATION PLAZA CATALUÑA LINE 3 1500VDC

Distributed Control System, SCADA, Protection Manager AC/DC Power and Interface IEC 60870-5-104 to the Control Center.

Total Scope: 1 Substation

2006
SUBSTATIONS MUSEROS, CAÑADA AND MASIA DE TRAVER 20KVAC/1500VDC METRO VALENCIA

SUBSTATIONS MUSEROS, CAÑADA AND MASIA DE TRAVER 20KVAC/1500VDC METRO VALENCIA

Distributed Control System and Interface IEC 60870-5-104 to the Control Center.

Total Scope: 3 Substation

2003-2006
SUBSTATIONS EXPANSION PLAN 2003-2006

SUBSTATIONS EXPANSION PLAN 2003-2006

Distributed Control System, SCADA, Protection Manager AC/DC Power and Interface IEC 60870-5-104 to the Control Center.

Total Scope: 12 Substations

2000-2002
SUBSTATIONS EXPANSION PLAN 2000-2002

SUBSTATIONS EXPANSION PLAN 2000-2002

Distributed Control System, SCADA, Protection Manager AC/DC Power and Interface IEC 60870-5-104 to the Control Center.

Total Scope: 5 Substations

2001
SUBSTATION NUEVOS MINISTERIOS 45/15KV (DISTRIBUTION SUBSTATION)

SUBSTATION NUEVOS MINISTERIOS 45/15KV (DISTRIBUTION SUBSTATION)

Distributed Control System, SCADA, Protection Manager AC/DC Power and Interface IEC 60870-5-101 to the Control Center.

Total Scope: 1 Substation

2003
TRANSFORMER CENTERS METRO SUR LINE 12

TRANSFORMER CENTERS METRO SUR LINE 12

Distributed Control System, SCADA, r and Interface IEC 60870-5-101 to the Control Center.

Total Scope: 43 Stations

Tram

2016
SCADA CONTROL CENTER FOR ENERGY AND FACILITIES WIN CC OA (SIEMENS)

SCADA CONTROL CENTER FOR ENERGY AND FACILITIES WIN CC OA (SIEMENS)

Design and Development, Integration, Configuration and Commissioning of the Control center of the electric installations (Substations, Transformers Stations, and Catenary Isolators) and mechanical installations (Elevators, escalators, HVAC, pumps…)

2015
TRANSFORMERS STATIONS LINE 2

TRANSFORMERS STATIONS LINE 2

Distributed Control System, SCADA, Protection Manager AC/DC Power and Interface IEC 60870-5-104 to the Control Center.

Total Scope: 9 Substations

2015
SUBSTATIONS LINE 2 (15000AC/750DC)

SUBSTATIONS LINE 2 (15000AC/750DC)

Distributed Control System, SCADA, Protection Manager AC/DC Power and Interface IEC 60870-5-104 to the Control Center.

Total Scope: 5 Substations

2015
TRANSFORMERS STATIONS LINE 1

TRANSFORMERS STATIONS LINE 1

Distributed Control System, SCADA, Protection Manager AC/DC Power and Interface IEC 60870-5-104 to the Control Center.

Total Scope: 26 Transformer Stations

2014
SCADA CONTROL CENTER FOR ENERGY AND FACILITIES WINCC OA (SIEMENS)

SCADA CONTROL CENTER FOR ENERGY AND FACILITIES WINCC OA (SIEMENS)

Desarrollo, instalación, pruebas y puesta en servicio del sistema de telemando de energía (TE) y del telemando centralizado de estaciones (TCE) basado en plataforma WinCC OA (Siemens) para el Tranvía de Madrid.

2011
SUBSTATION RIBADESELLA 20KVAC/750VDC

SUBSTATION RIBADESELLA 20KVAC/750VDC

Distributed Control System, SCADA, Protection Manager AC/DC Power and Interface IEC 60870-5-104 to the Control Center.

Total Scope: 1 Substation

2011
SUBSTATIONS 15KVAC/750VDC LINE 1 TRAM MURCIA

SUBSTATIONS 15KVAC/750VDC LINE 1 TRAM MURCIA

Distributed Control System, SCADA, Protection Manager AC/DC Power and Interface IEC 60870-5-104 to the Control Center.

Total Scope: 5 Substations

2011
SUBSTATIONS 15KVAC/750VDC LINE 1 TRAM MALLORCA

SUBSTATIONS 15KVAC/750VDC LINE 1 TRAM MALLORCA

Distributed Control System based on IEC 61850 protocol, SCADA, Calculation and Simulation of protections Selectivity IEC 61850 (Differential Protection, Distance Protection, Transformer Protection…) and Interface IEC 60870-5-104 to the Control Center.

Total Scope: 3 Substations

2008
TRANSFORMERS STATIONS LINE 3

TRANSFORMERS STATIONS LINE 3

Distributed Control System, SCADA, Protection Manager AC/DC Power and Interface IEC 60870-5-104 to the Control Center.

Total Scope: 8 Transformer Stations

2008
SUBSTATIONS LINE 3 (15000AC/750DC)

SUBSTATIONS LINE 3 (15000AC/750DC)

Distributed Control System, SCADA, Protection Manager AC/DC Power and Interface IEC 60870-5-104 to the Control Center.

Total Scope: 7 Substations

2008
SCADA CONTROL CENTER FOR ENERGY AND FACILITIES

SCADA CONTROL CENTER FOR ENERGY AND FACILITIES

Design and Development, Integration, Configuration and Commissioning of the Control center of the electric installations (Substations, Transformers Stations, and Catenary Isolators)

2008
SUBSTATIONS 15KVAC/750VDC LINE 1 TRAM SEVILLA

SUBSTATIONS 15KVAC/750VDC LINE 1 TRAM SEVILLA

Distributed Control System, SCADA and Interface IEC 60870-5-104 to the Control Center.

Total Scope: 2 Substations

2008
TRANSFORMER STATION 15/0,4KV LINE 1 TRAM SEVILLA

TRANSFORMER STATION 15/0,4KV LINE 1 TRAM SEVILLA

Distributed Control System, SCADA and Interface IEC 60870-5-104 to the Control Center.

Total Scope: 4 Transformer Stations

2008
LOCAL POST CATENARY ISOLATORS LINE 1 TRAM SEVILLA

LOCAL POST CATENARY ISOLATORS LINE 1 TRAM SEVILLA

Distributed Control System, SCADA and Interface IEC 60870-5-104 to the Control Center.

Total Scope: 4 Local Post Catenary Isolators