References
Rail Sector
High Speed Line
HIGH SPEED LINE ANKARA-ESKISEHIR 1 X 25KV
Distributed Control System, SCADA, Protection Manager AC and DC Power and Interface IEC-60870-5-104 with Control Center. Total Scope: 4 Traction Substations and 4 Neutral Zones.
HIGH SPEED RAILWAY MEDINA DEL CAMPO-SALAMANCA (SPAIN) 2X25KV
Distributed Control System based on IEC 61850 protocol, SCADA, Calculation and Simulation of protections Selectivity IEC 61850 (Differential Protection, Distance Protection, Transformer Protection…) and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 1 Substation, 2 Section Post and 2 Paralleling Post
HIGH SPEED RAILWAY VALLADOLID (SPAIN) 2X25KV
Distributed Control System based on IEC 61850 protocol, SCADA, Calculation and Simulation of protections Selectivity IEC 61850 (Differential Protection, Distance Protection, Transformer Protection…) and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 1 Substation
HIGH SPEED RAILWAY BARCELONA-FIGUERAS (SPAIN) 2X25KV LAV
Distributed Control System based on IEC 61850 protocol, SCADA, Calculation and Simulation of protections Selectivity IEC 61850 (Differential Protection, Distance Protection, Transformer Protection…) and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 4 Substation, 2 Section Post and 8 Paralleling Post
HIGH SPEED RAILWAY ORENSE-SANTIAGO DE COMPOSTELA (SPAIN) 2X25KV
Distributed Control System for catenary isolators, SCADA, and Interface IEC 60870-5-104 to the Control Center. Total Scope: 55 Local Operator Station for Catenary Isolators.
HIGH SPEED RAILWAY BYPASS SEVILLA-MADRID-BARCELONA (SPAIN) 2X25KV
Distributed Control System for catenary isolators, SCADA, and Interface IEC 60870-5-104 to the Control Center. Total Scope: 1 Local Operator Station for Catenary Isolators
HIGH SPEED RAILWAY MADRID-SEVILLA (SPAIN) 1X25KV WORKSHOP SANTA CATALINA II-MADRID
Command and Control System, SCADA and Interface IEC 60870-5-104 to the Control Center
Total Scope: 1 workshop
HIGH SPEED RAILWAY MADRID-SEVILLA (SPAIN) 1X25KV
Distributed Control System, SCADA, Calculation and Simulation of protections Selectivity (Differential Protection, Distance Protection, Transformer Protection…) and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 13 Substations and 29 Technical Buildings
HIGH SPEED RAILWAY MADRID-SEVILLA (SPAIN) 1X25KV AND MADRID-VALENCIA (SPAIN) 2X25KV SWITCH POINT HEATING
Control System of heaters for switch points, SCADA and Interface IEC 60870-5-104 to the Control Center.
HIGH SPEED RAILWAY MADRID-SEVILLA 1X25KV
Distributed Control System, SCADA, Calculation and Simulation of protections Selectivity (Differential Protection, Distance Protection, Transformer Protection…) and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 13 Substations and 29 Technical Buildings
HIGH SPEED RAILWAY: MADRID-SEVILLA · CÓRDOBA-MÁLAGA ·BARCELONA-FRONTERA FRANCESA · MADRID-VALENCIA · ALBACETE-ALICANTE · MEDINA DEL CAMPO-SALAMANCA · ORENSE-SANTIAGO · VIGO-LA CORUÑA
Energy Quality Measurement System, EN 50160-EN 50163 SICA software
Underground
- All
- 2000
- 2001
- 2002
- 2003
- 2004
- 2005
- 2006
- 2007
- 2008
- 2009
- 2010
- 2011
- 2012
- 2013
- 2014
- 2015
- 2016
- FGV
- Metro Madrid
- OPRET Metro Santo Domingo
- TMB
SCADA CONTROL CENTER FOR ENERGY AND FACILITIES
Design and Development, Integration, Configuration and Commissioning of the Control center of the electric installations (Substations, Transformers Stations, and Catenary Isolators) and mechanical installations (Elevators, escalators, HVAC, pumps…)
TRACTION SUBSTATION LINE 9 30KVAC/1500VDC
Distributed Control System, SCADA, Protection Manager AC/DC Power and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 18 Substations
SUBSTATION PACO DE LUCIA LINE 9 1500VDC
Manager AC/DC Power and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 1 Substation
TRANSFORMER STATION LINE 9
Distributed Control System, SCADA, Protection Manager AC/DC Power and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 110 Transformer Stations
SUBSTATIONS 15KVAC/750VDC LINE 1, 2 3 AND 4 TRAM ALICANTE-DENIA
Distributed Control System, SCADA and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 12 Substations
TRANSFORMERS STATIONS LINE 2 METRO SANTO DOMINGO
Distributed Control System, SCADA and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 14 Transformer Stations
SUBESTATION SACEDAL LINE 9 1500VDC
Distributed Control System, SCADA, Protection Manager AC/DC Power and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 1 Substation
TRANSFORMER STATION 15/0,4KV LINE 1, 2 3 AND 4 TRAM ALICANTE-DENIA
Distributed Control System, SCADA and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 12 Substations
LOCAL POST CATENARY ISOLATORS LINE 1, 2 3 AND 4 TRAM ALICANTE-DENIA
Distributed Control System, SCADA and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 12 Local Post Catenary Isolators
SUBESTATION PRINCIPE PIO LINE 10 1500VDC
Distributed Control System, SCADA, Protection Manager AC/DC Power and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 1 Substation
SUBSTATION ZONA FRANCA AND SAGRERA LINE 9 230/30KV
Distributed Control System, SCADA, Protection Manager AC/DC Power and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 2 Substations
SUBSTATION BACKUP ZONA FRANCA AND SAGRERA LINE 9 25/30KV
Distributed Control System, SCADA, Protection Manager AC/DC Power and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 2 Substations
SUBSTATIONS EXPANSION PLAN 2007-2010
Distributed Control System, SCADA, Protection Manager AC/DC Power and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 10 Substations
TRANSFORMERS STATIONS LINE 1 METRO SANTO DOMINGO
Distributed Control System, SCADA and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 18 Transformer Stations
ENERGY MANAGEMENT SYSTEM (EMS)
Design and Development, Integration, Configuration and Commissioning of Energy Management System.
SUBSTATION SANT GENIS LINE 3 1500VDC
Distributed Control System, SCADA, Protection Manager AC/DC Power and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 1 Substation
SUBSTATION PLAZA CATALUÑA LINE 3 1500VDC
Distributed Control System, SCADA, Protection Manager AC/DC Power and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 1 Substation
SUBSTATIONS MUSEROS, CAÑADA AND MASIA DE TRAVER 20KVAC/1500VDC METRO VALENCIA
Distributed Control System and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 3 Substation
SUBSTATIONS EXPANSION PLAN 2003-2006
Distributed Control System, SCADA, Protection Manager AC/DC Power and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 12 Substations
SUBSTATIONS EXPANSION PLAN 2000-2002
Distributed Control System, SCADA, Protection Manager AC/DC Power and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 5 Substations
SUBSTATION NUEVOS MINISTERIOS 45/15KV (DISTRIBUTION SUBSTATION)
Distributed Control System, SCADA, Protection Manager AC/DC Power and Interface IEC 60870-5-101 to the Control Center.
Total Scope: 1 Substation
TRANSFORMER CENTERS METRO SUR LINE 12
Distributed Control System, SCADA, r and Interface IEC 60870-5-101 to the Control Center.
Total Scope: 43 Stations
Tram
SCADA CONTROL CENTER FOR ENERGY AND FACILITIES WIN CC OA (SIEMENS)
Design and Development, Integration, Configuration and Commissioning of the Control center of the electric installations (Substations, Transformers Stations, and Catenary Isolators) and mechanical installations (Elevators, escalators, HVAC, pumps…)
TRANSFORMERS STATIONS LINE 2
Distributed Control System, SCADA, Protection Manager AC/DC Power and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 9 Substations
SUBSTATIONS LINE 2 (15000AC/750DC)
Distributed Control System, SCADA, Protection Manager AC/DC Power and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 5 Substations
TRANSFORMERS STATIONS LINE 1
Distributed Control System, SCADA, Protection Manager AC/DC Power and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 26 Transformer Stations
SCADA CONTROL CENTER FOR ENERGY AND FACILITIES WINCC OA (SIEMENS)
Desarrollo, instalación, pruebas y puesta en servicio del sistema de telemando de energía (TE) y del telemando centralizado de estaciones (TCE) basado en plataforma WinCC OA (Siemens) para el Tranvía de Madrid.
SUBSTATION RIBADESELLA 20KVAC/750VDC
Distributed Control System, SCADA, Protection Manager AC/DC Power and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 1 Substation
SUBSTATIONS 15KVAC/750VDC LINE 1 TRAM MURCIA
Distributed Control System, SCADA, Protection Manager AC/DC Power and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 5 Substations
SUBSTATIONS 15KVAC/750VDC LINE 1 TRAM MALLORCA
Distributed Control System based on IEC 61850 protocol, SCADA, Calculation and Simulation of protections Selectivity IEC 61850 (Differential Protection, Distance Protection, Transformer Protection…) and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 3 Substations
TRANSFORMERS STATIONS LINE 3
Distributed Control System, SCADA, Protection Manager AC/DC Power and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 8 Transformer Stations
SUBSTATIONS LINE 3 (15000AC/750DC)
Distributed Control System, SCADA, Protection Manager AC/DC Power and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 7 Substations
SCADA CONTROL CENTER FOR ENERGY AND FACILITIES
Design and Development, Integration, Configuration and Commissioning of the Control center of the electric installations (Substations, Transformers Stations, and Catenary Isolators)
SUBSTATIONS 15KVAC/750VDC LINE 1 TRAM SEVILLA
Distributed Control System, SCADA and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 2 Substations
TRANSFORMER STATION 15/0,4KV LINE 1 TRAM SEVILLA
Distributed Control System, SCADA and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 4 Transformer Stations
LOCAL POST CATENARY ISOLATORS LINE 1 TRAM SEVILLA
Distributed Control System, SCADA and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 4 Local Post Catenary Isolators