References
Rail Sector
High Speed Line
![HIGH SPEED LINE ANKARA-ESKISEHIR 1 X 25KV](/media/widgetkit/cliente_logo_tcdd_turkish_railway-bc9bd10db62299fa00a09cc2f13eeeb0.png)
HIGH SPEED LINE ANKARA-ESKISEHIR 1 X 25KV
Distributed Control System, SCADA, Protection Manager AC and DC Power and Interface IEC-60870-5-104 with Control Center. Total Scope: 4 Traction Substations and 4 Neutral Zones.
![HIGH SPEED RAILWAY MEDINA DEL CAMPO-SALAMANCA (SPAIN) 2X25KV](/media/widgetkit/cliente_logo_adif-7d0ad63c21df64a3ecbe187e0cd33099.png)
HIGH SPEED RAILWAY MEDINA DEL CAMPO-SALAMANCA (SPAIN) 2X25KV
Distributed Control System based on IEC 61850 protocol, SCADA, Calculation and Simulation of protections Selectivity IEC 61850 (Differential Protection, Distance Protection, Transformer Protection…) and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 1 Substation, 2 Section Post and 2 Paralleling Post
![HIGH SPEED RAILWAY VALLADOLID (SPAIN) 2X25KV](/media/widgetkit/cliente_logo_adif-7d0ad63c21df64a3ecbe187e0cd33099.png)
HIGH SPEED RAILWAY VALLADOLID (SPAIN) 2X25KV
Distributed Control System based on IEC 61850 protocol, SCADA, Calculation and Simulation of protections Selectivity IEC 61850 (Differential Protection, Distance Protection, Transformer Protection…) and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 1 Substation
![HIGH SPEED RAILWAY BARCELONA-FIGUERAS (SPAIN) 2X25KV LAV](/media/widgetkit/cliente_logo_adif-7d0ad63c21df64a3ecbe187e0cd33099.png)
HIGH SPEED RAILWAY BARCELONA-FIGUERAS (SPAIN) 2X25KV LAV
Distributed Control System based on IEC 61850 protocol, SCADA, Calculation and Simulation of protections Selectivity IEC 61850 (Differential Protection, Distance Protection, Transformer Protection…) and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 4 Substation, 2 Section Post and 8 Paralleling Post
![HIGH SPEED RAILWAY ORENSE-SANTIAGO DE COMPOSTELA (SPAIN) 2X25KV](/media/widgetkit/cliente_logo_adif-7d0ad63c21df64a3ecbe187e0cd33099.png)
HIGH SPEED RAILWAY ORENSE-SANTIAGO DE COMPOSTELA (SPAIN) 2X25KV
Distributed Control System for catenary isolators, SCADA, and Interface IEC 60870-5-104 to the Control Center. Total Scope: 55 Local Operator Station for Catenary Isolators.
![HIGH SPEED RAILWAY BYPASS SEVILLA-MADRID-BARCELONA (SPAIN) 2X25KV](/media/widgetkit/cliente_logo_adif-7d0ad63c21df64a3ecbe187e0cd33099.png)
HIGH SPEED RAILWAY BYPASS SEVILLA-MADRID-BARCELONA (SPAIN) 2X25KV
Distributed Control System for catenary isolators, SCADA, and Interface IEC 60870-5-104 to the Control Center. Total Scope: 1 Local Operator Station for Catenary Isolators
![HIGH SPEED RAILWAY MADRID-SEVILLA (SPAIN) 1X25KV WORKSHOP SANTA CATALINA II-MADRID](/media/widgetkit/cliente_logo_adif-7d0ad63c21df64a3ecbe187e0cd33099.png)
HIGH SPEED RAILWAY MADRID-SEVILLA (SPAIN) 1X25KV WORKSHOP SANTA CATALINA II-MADRID
Command and Control System, SCADA and Interface IEC 60870-5-104 to the Control Center
Total Scope: 1 workshop
![HIGH SPEED RAILWAY MADRID-SEVILLA (SPAIN) 1X25KV](/media/widgetkit/cliente_logo_adif-7d0ad63c21df64a3ecbe187e0cd33099.png)
HIGH SPEED RAILWAY MADRID-SEVILLA (SPAIN) 1X25KV
Distributed Control System, SCADA, Calculation and Simulation of protections Selectivity (Differential Protection, Distance Protection, Transformer Protection…) and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 13 Substations and 29 Technical Buildings
![HIGH SPEED RAILWAY MADRID-SEVILLA (SPAIN) 1X25KV AND MADRID-VALENCIA (SPAIN) 2X25KV SWITCH POINT HEATING](/media/widgetkit/cliente_logo_adif-7d0ad63c21df64a3ecbe187e0cd33099.png)
HIGH SPEED RAILWAY MADRID-SEVILLA (SPAIN) 1X25KV AND MADRID-VALENCIA (SPAIN) 2X25KV SWITCH POINT HEATING
Control System of heaters for switch points, SCADA and Interface IEC 60870-5-104 to the Control Center.
![HIGH SPEED RAILWAY MADRID-SEVILLA 1X25KV](/media/widgetkit/cliente_logo_adif-7d0ad63c21df64a3ecbe187e0cd33099.png)
HIGH SPEED RAILWAY MADRID-SEVILLA 1X25KV
Distributed Control System, SCADA, Calculation and Simulation of protections Selectivity (Differential Protection, Distance Protection, Transformer Protection…) and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 13 Substations and 29 Technical Buildings
![HIGH SPEED RAILWAY: MADRID-SEVILLA · CÓRDOBA-MÁLAGA ·BARCELONA-FRONTERA FRANCESA · MADRID-VALENCIA · ALBACETE-ALICANTE · MEDINA DEL CAMPO-SALAMANCA · ORENSE-SANTIAGO · VIGO-LA CORUÑA](/media/widgetkit/cliente_logo_adif-7d0ad63c21df64a3ecbe187e0cd33099.png)
HIGH SPEED RAILWAY: MADRID-SEVILLA · CÓRDOBA-MÁLAGA ·BARCELONA-FRONTERA FRANCESA · MADRID-VALENCIA · ALBACETE-ALICANTE · MEDINA DEL CAMPO-SALAMANCA · ORENSE-SANTIAGO · VIGO-LA CORUÑA
Energy Quality Measurement System, EN 50160-EN 50163 SICA software
Underground
- All
- 2000
- 2001
- 2002
- 2003
- 2004
- 2005
- 2006
- 2007
- 2008
- 2009
- 2010
- 2011
- 2012
- 2013
- 2014
- 2015
- 2016
- FGV
- Metro Madrid
- OPRET Metro Santo Domingo
- TMB
![SCADA CONTROL CENTER FOR ENERGY AND FACILITIES](/media/widgetkit/cliente_logo_fgv-b8c0ff5d8b7c54b8246574a2aaf9ac38.png)
SCADA CONTROL CENTER FOR ENERGY AND FACILITIES
Design and Development, Integration, Configuration and Commissioning of the Control center of the electric installations (Substations, Transformers Stations, and Catenary Isolators) and mechanical installations (Elevators, escalators, HVAC, pumps…)
![TRACTION SUBSTATION LINE 9 30KVAC/1500VDC](/media/widgetkit/cliente_logo_tmb-d20e7f7eea215a5ee7d6c0d94d8de766.png)
TRACTION SUBSTATION LINE 9 30KVAC/1500VDC
Distributed Control System, SCADA, Protection Manager AC/DC Power and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 18 Substations
![SUBSTATION PACO DE LUCIA LINE 9 1500VDC](/media/widgetkit/cliente_logo_metro_madrid-122f1e9f4f5bbcee7b84a1eb684bcbd7.png)
SUBSTATION PACO DE LUCIA LINE 9 1500VDC
Manager AC/DC Power and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 1 Substation
![TRANSFORMER STATION LINE 9](/media/widgetkit/cliente_logo_tmb-d20e7f7eea215a5ee7d6c0d94d8de766.png)
TRANSFORMER STATION LINE 9
Distributed Control System, SCADA, Protection Manager AC/DC Power and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 110 Transformer Stations
![SUBSTATIONS 15KVAC/750VDC LINE 1, 2 3 AND 4 TRAM ALICANTE-DENIA](/media/widgetkit/cliente_logo_fgv-b8c0ff5d8b7c54b8246574a2aaf9ac38.png)
SUBSTATIONS 15KVAC/750VDC LINE 1, 2 3 AND 4 TRAM ALICANTE-DENIA
Distributed Control System, SCADA and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 12 Substations
![TRANSFORMERS STATIONS LINE 2 METRO SANTO DOMINGO](/media/widgetkit/cliente_logo_opret-2ac0bf1bbfd784609e1a834ea808048b.png)
TRANSFORMERS STATIONS LINE 2 METRO SANTO DOMINGO
Distributed Control System, SCADA and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 14 Transformer Stations
![SUBESTATION SACEDAL LINE 9 1500VDC](/media/widgetkit/cliente_logo_metro_madrid-122f1e9f4f5bbcee7b84a1eb684bcbd7.png)
SUBESTATION SACEDAL LINE 9 1500VDC
Distributed Control System, SCADA, Protection Manager AC/DC Power and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 1 Substation
![TRANSFORMER STATION 15/0,4KV LINE 1, 2 3 AND 4 TRAM ALICANTE-DENIA](/media/widgetkit/cliente_logo_fgv-b8c0ff5d8b7c54b8246574a2aaf9ac38.png)
TRANSFORMER STATION 15/0,4KV LINE 1, 2 3 AND 4 TRAM ALICANTE-DENIA
Distributed Control System, SCADA and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 12 Substations
![LOCAL POST CATENARY ISOLATORS LINE 1, 2 3 AND 4 TRAM ALICANTE-DENIA](/media/widgetkit/cliente_logo_fgv-b8c0ff5d8b7c54b8246574a2aaf9ac38.png)
LOCAL POST CATENARY ISOLATORS LINE 1, 2 3 AND 4 TRAM ALICANTE-DENIA
Distributed Control System, SCADA and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 12 Local Post Catenary Isolators
![SUBESTATION PRINCIPE PIO LINE 10 1500VDC](/media/widgetkit/cliente_logo_metro_madrid-122f1e9f4f5bbcee7b84a1eb684bcbd7.png)
SUBESTATION PRINCIPE PIO LINE 10 1500VDC
Distributed Control System, SCADA, Protection Manager AC/DC Power and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 1 Substation
![SUBSTATION ZONA FRANCA AND SAGRERA LINE 9 230/30KV](/media/widgetkit/cliente_logo_tmb-d20e7f7eea215a5ee7d6c0d94d8de766.png)
SUBSTATION ZONA FRANCA AND SAGRERA LINE 9 230/30KV
Distributed Control System, SCADA, Protection Manager AC/DC Power and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 2 Substations
![SUBSTATION BACKUP ZONA FRANCA AND SAGRERA LINE 9 25/30KV](/media/widgetkit/cliente_logo_tmb-d20e7f7eea215a5ee7d6c0d94d8de766.png)
SUBSTATION BACKUP ZONA FRANCA AND SAGRERA LINE 9 25/30KV
Distributed Control System, SCADA, Protection Manager AC/DC Power and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 2 Substations
![SUBSTATIONS EXPANSION PLAN 2007-2010](/media/widgetkit/cliente_logo_metro_madrid-122f1e9f4f5bbcee7b84a1eb684bcbd7.png)
SUBSTATIONS EXPANSION PLAN 2007-2010
Distributed Control System, SCADA, Protection Manager AC/DC Power and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 10 Substations
![TRANSFORMERS STATIONS LINE 1 METRO SANTO DOMINGO](/media/widgetkit/cliente_logo_opret-2ac0bf1bbfd784609e1a834ea808048b.png)
TRANSFORMERS STATIONS LINE 1 METRO SANTO DOMINGO
Distributed Control System, SCADA and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 18 Transformer Stations
![ENERGY MANAGEMENT SYSTEM (EMS)](/media/widgetkit/cliente_logo_tmb-d20e7f7eea215a5ee7d6c0d94d8de766.png)
ENERGY MANAGEMENT SYSTEM (EMS)
Design and Development, Integration, Configuration and Commissioning of Energy Management System.
![SUBSTATION SANT GENIS LINE 3 1500VDC](/media/widgetkit/cliente_logo_tmb-d20e7f7eea215a5ee7d6c0d94d8de766.png)
SUBSTATION SANT GENIS LINE 3 1500VDC
Distributed Control System, SCADA, Protection Manager AC/DC Power and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 1 Substation
![SUBSTATION PLAZA CATALUÑA LINE 3 1500VDC](/media/widgetkit/cliente_logo_tmb-d20e7f7eea215a5ee7d6c0d94d8de766.png)
SUBSTATION PLAZA CATALUÑA LINE 3 1500VDC
Distributed Control System, SCADA, Protection Manager AC/DC Power and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 1 Substation
![SUBSTATIONS MUSEROS, CAÑADA AND MASIA DE TRAVER 20KVAC/1500VDC METRO VALENCIA](/media/widgetkit/cliente_logo_fgv-b8c0ff5d8b7c54b8246574a2aaf9ac38.png)
SUBSTATIONS MUSEROS, CAÑADA AND MASIA DE TRAVER 20KVAC/1500VDC METRO VALENCIA
Distributed Control System and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 3 Substation
![SUBSTATIONS EXPANSION PLAN 2003-2006](/media/widgetkit/cliente_logo_metro_madrid-122f1e9f4f5bbcee7b84a1eb684bcbd7.png)
SUBSTATIONS EXPANSION PLAN 2003-2006
Distributed Control System, SCADA, Protection Manager AC/DC Power and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 12 Substations
![SUBSTATIONS EXPANSION PLAN 2000-2002](/media/widgetkit/cliente_logo_metro_madrid-122f1e9f4f5bbcee7b84a1eb684bcbd7.png)
SUBSTATIONS EXPANSION PLAN 2000-2002
Distributed Control System, SCADA, Protection Manager AC/DC Power and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 5 Substations
![SUBSTATION NUEVOS MINISTERIOS 45/15KV (DISTRIBUTION SUBSTATION)](/media/widgetkit/cliente_logo_metro_madrid-122f1e9f4f5bbcee7b84a1eb684bcbd7.png)
SUBSTATION NUEVOS MINISTERIOS 45/15KV (DISTRIBUTION SUBSTATION)
Distributed Control System, SCADA, Protection Manager AC/DC Power and Interface IEC 60870-5-101 to the Control Center.
Total Scope: 1 Substation
![TRANSFORMER CENTERS METRO SUR LINE 12](/media/widgetkit/cliente_logo_metro_madrid-122f1e9f4f5bbcee7b84a1eb684bcbd7.png)
TRANSFORMER CENTERS METRO SUR LINE 12
Distributed Control System, SCADA, r and Interface IEC 60870-5-101 to the Control Center.
Total Scope: 43 Stations
Tram
![SCADA CONTROL CENTER FOR ENERGY AND FACILITIES WIN CC OA (SIEMENS)](/media/widgetkit/cliente_logo_metropolitano_granada-b510cf538b3a67eed8a3d6234a7421b2.png)
SCADA CONTROL CENTER FOR ENERGY AND FACILITIES WIN CC OA (SIEMENS)
Design and Development, Integration, Configuration and Commissioning of the Control center of the electric installations (Substations, Transformers Stations, and Catenary Isolators) and mechanical installations (Elevators, escalators, HVAC, pumps…)
![TRANSFORMERS STATIONS LINE 2](/media/widgetkit/cliente_logo_metroligero_oeste-d5503999e02fdc62aa2e8f010e0620a8.png)
TRANSFORMERS STATIONS LINE 2
Distributed Control System, SCADA, Protection Manager AC/DC Power and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 9 Substations
![SUBSTATIONS LINE 2 (15000AC/750DC)](/media/widgetkit/cliente_logo_metroligero_oeste-d5503999e02fdc62aa2e8f010e0620a8.png)
SUBSTATIONS LINE 2 (15000AC/750DC)
Distributed Control System, SCADA, Protection Manager AC/DC Power and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 5 Substations
![TRANSFORMERS STATIONS LINE 1](/media/widgetkit/cliente_logo_metropolitano_granada-b510cf538b3a67eed8a3d6234a7421b2.png)
TRANSFORMERS STATIONS LINE 1
Distributed Control System, SCADA, Protection Manager AC/DC Power and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 26 Transformer Stations
![SCADA CONTROL CENTER FOR ENERGY AND FACILITIES WINCC OA (SIEMENS)](/media/widgetkit/cliente_logo_metroligero_oeste-d5503999e02fdc62aa2e8f010e0620a8.png)
SCADA CONTROL CENTER FOR ENERGY AND FACILITIES WINCC OA (SIEMENS)
Desarrollo, instalación, pruebas y puesta en servicio del sistema de telemando de energía (TE) y del telemando centralizado de estaciones (TCE) basado en plataforma WinCC OA (Siemens) para el Tranvía de Madrid.
![SUBSTATION RIBADESELLA 20KVAC/750VDC](/media/widgetkit/cliente_logo_feve-8cd171f89b425364c87c72d8662fe732.png)
SUBSTATION RIBADESELLA 20KVAC/750VDC
Distributed Control System, SCADA, Protection Manager AC/DC Power and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 1 Substation
![SUBSTATIONS 15KVAC/750VDC LINE 1 TRAM MURCIA](/media/widgetkit/cliente_logo_tranva_de_murcia-5aad2aeb58e4f55b682e4ac3aa0259e7.png)
SUBSTATIONS 15KVAC/750VDC LINE 1 TRAM MURCIA
Distributed Control System, SCADA, Protection Manager AC/DC Power and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 5 Substations
![SUBSTATIONS 15KVAC/750VDC LINE 1 TRAM MALLORCA](/media/widgetkit/cliente_logo_sfm-f615e35cacd6cf705cacb71bb4345842.png)
SUBSTATIONS 15KVAC/750VDC LINE 1 TRAM MALLORCA
Distributed Control System based on IEC 61850 protocol, SCADA, Calculation and Simulation of protections Selectivity IEC 61850 (Differential Protection, Distance Protection, Transformer Protection…) and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 3 Substations
![TRANSFORMERS STATIONS LINE 3](/media/widgetkit/cliente_logo_metroligero_oeste-d5503999e02fdc62aa2e8f010e0620a8.png)
TRANSFORMERS STATIONS LINE 3
Distributed Control System, SCADA, Protection Manager AC/DC Power and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 8 Transformer Stations
![SUBSTATIONS LINE 3 (15000AC/750DC)](/media/widgetkit/cliente_logo_metroligero_oeste-d5503999e02fdc62aa2e8f010e0620a8.png)
SUBSTATIONS LINE 3 (15000AC/750DC)
Distributed Control System, SCADA, Protection Manager AC/DC Power and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 7 Substations
![SCADA CONTROL CENTER FOR ENERGY AND FACILITIES](/media/widgetkit/cliente_logo_tussam_sevilla-10a3f93ca29167890feb9907040eea63.png)
SCADA CONTROL CENTER FOR ENERGY AND FACILITIES
Design and Development, Integration, Configuration and Commissioning of the Control center of the electric installations (Substations, Transformers Stations, and Catenary Isolators)
![SUBSTATIONS 15KVAC/750VDC LINE 1 TRAM SEVILLA](/media/widgetkit/cliente_logo_tussam_sevilla-10a3f93ca29167890feb9907040eea63.png)
SUBSTATIONS 15KVAC/750VDC LINE 1 TRAM SEVILLA
Distributed Control System, SCADA and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 2 Substations
![TRANSFORMER STATION 15/0,4KV LINE 1 TRAM SEVILLA](/media/widgetkit/cliente_logo_tussam_sevilla-10a3f93ca29167890feb9907040eea63.png)
TRANSFORMER STATION 15/0,4KV LINE 1 TRAM SEVILLA
Distributed Control System, SCADA and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 4 Transformer Stations
![LOCAL POST CATENARY ISOLATORS LINE 1 TRAM SEVILLA](/media/widgetkit/cliente_logo_tussam_sevilla-10a3f93ca29167890feb9907040eea63.png)
LOCAL POST CATENARY ISOLATORS LINE 1 TRAM SEVILLA
Distributed Control System, SCADA and Interface IEC 60870-5-104 to the Control Center.
Total Scope: 4 Local Post Catenary Isolators