CENTRAL SCADA FOR QUITO METRO

CENTRAL SCADA FOR QUITO METRO

Measurement, Protection and Control System. Construction and supply of protection and control panels and central SCADA for all substations and transformer stations of the Quito Metro (Siemens Rail).

2017
CENTRAL SCADA MARMARAY PROJECT (TURKIA)

CENTRAL SCADA MARMARAY PROJECT (TURKIA)

Centralised Substation Control System with WinCC OA and interfaces with other control systems.

2017
SYSTEM OF MEASUREMENT, PROTECTION AND CONTROL FOR SUBSTATIONS AND TRANSFORMER STATIONS OF THE ENTIRE QUITO METRO LINE

SYSTEM OF MEASUREMENT, PROTECTION AND CONTROL FOR SUBSTATIONS AND TRANSFORMER STATIONS OF THE ENTIRE QUITO METRO LINE

Measurement, Protection and Control System. Construction and supply of protection and control cabinets and local SCADA for all substations and transformer stations of the Quito Metro (Siemens Rail).

2017
CONTROL SYSTEM AND REMOTE CONTROL OF SUBSTATION LINE 9

CONTROL SYSTEM AND REMOTE CONTROL OF SUBSTATION LINE 9

Development, installation, testing and commissioning of the Traction Substation Control and Remote Control System on Line 9 of the Barcelona Metro.

2017
INGEBER INVERTER INTEGRATION IN LOCAL SCADA AND REMOTE CONTROL OF POWER LINE 9

INGEBER INVERTER INTEGRATION IN LOCAL SCADA AND REMOTE CONTROL OF POWER LINE 9

Complete integration of INGEBER inverter (INGETEAM) in Local SCADA and Energy Remote Control in Line 9 traction substation of Metro de Barcelona.

2016
MAIN ENERGY CONTROL CENTRE - SCADA ALICANTE DENIA TRAMWAY

MAIN ENERGY CONTROL CENTRE - SCADA ALICANTE DENIA TRAMWAY

Development, installation, testing and commissioning of the Zenon platform-based operation control center (OCC) system (COPA-DATA) for the Alicante - Denia tramway line.

2016
CONTROL PRINCIPAL DE ENERGÍA - SCADA GRANADA TRAMWAY

CONTROL PRINCIPAL DE ENERGÍA - SCADA GRANADA TRAMWAY

Development, installation, supply, development, installation, testing and commissioning of the operation control center (OCC) system based on the Vicos RSC (Siemens) platform and station control center (SCC) based on the WinCC OA (Siemens) platform for the Granada tramway.

2015
MAIN CONTROL CENTER SCADA ML2 Y ML3 MADRID TRAMWAY

MAIN CONTROL CENTER SCADA ML2 Y ML3 MADRID TRAMWAY

Development, installation, testing and commissioning of the remote operation control center (OCC) and the station control center (SCC) based on the WinCC OA (siemens) platform for the Madrid Tramway.

2016
HIGH-SPEED TRAIN MEDINA DEL CAMPO-SALAMANCA  2X25KV

HIGH-SPEED TRAIN MEDINA DEL CAMPO-SALAMANCA 2X25KV

Development, installation, testing and commissioning of the distributed control system (DCS) based on iec-61850 platform, SCADA system based on WinCC (Siemens), calculation of protection selectivity and adjustments thereof and iec 60870-5-104 interface with operation control center (OCC).

Total range: 1 substation, 2 final autotransformers section post (FASP) and 2 intermediate autotransformers section post (IASP).

2006-2016
TRACTION SUBSTATION LINE 9 30KVAC/1500VDC

TRACTION SUBSTATION LINE 9 30KVAC/1500VDC

Development, installation, testing and commissioning of the distributed control system (DCS), scada system and iec 60870-5-104 interface with operation control center (OCC).

Total range: 18 substations.

2015
SUBESTATION PACO DE LUCIA LÍNE 9 1500VDC

SUBESTATION PACO DE LUCIA LÍNE 9 1500VDC

Development, installation, testing and commissioning of the distributed control system (SICD), SCADA system and iec 60870-5-104 interface with power control center (PCC).

Total range: 1 substation.

2006-2015
TRANSFORMATION STATION LINE 9

TRANSFORMATION STATION LINE 9

Development, installation, testing and commissioning of the distributed control system (DCS), scada system and iec 60870-5-104 interface with power control center (PCC).

Total scope: 110 transformer stations (TS).

2015
TRANSFORMATION STATION LINEA 2

TRANSFORMATION STATION LINEA 2

Development, installation, testing and commissioning of the distributed control system (DCS), scada system and iec 60870-5-104 interface with power control center (PCC).

Total scope: 9 transformer stations (TS).

2015
SUBESTATIONS LINE 2 (15000AC/750DC)

SUBESTATIONS LINE 2 (15000AC/750DC)

Development, installation, testing and commissioning of the distributed control system (DCS), scada system and iec 60870-5-104 interface with power control center (PCC).

Total scope: 5 transformer stations (TS).

2015
TRANSFORMATION STATION LINE 1

TRANSFORMATION STATION LINE 1

Development, installation, testing and commissioning of the distributed control system (SICD), SCADA system, calculation of protection selectivity and protection settings and iec 60870-5-104 interface with power control center (PCC).

Total scope: 26 transformer stations (TC).

2016
ENERGY TRADING COMPANY

ENERGY TRADING COMPANY

Development, installation, testing and commissioning of the energy billing supervision and management system for some 280,000 customers.

2015
ENERGY MEASUREMENT AND MANAGEMENT SYSTEMS BASF (TARRAGONA)

ENERGY MEASUREMENT AND MANAGEMENT SYSTEMS BASF (TARRAGONA)

Development, installation, testing and commissioning of the protection and control system BASF Española SL (Tarragona).

2015
SCADA CONTROL SYSTEM WIND FARM JAMAICA

SCADA CONTROL SYSTEM WIND FARM JAMAICA

Development, installation, testing and commissioning of the distributed control system (SICD) and SCADA system based on SEL platform for Munro wind farm and Wigton wind farm (Jamaica).

2015
CONTROL AND PROTECTION SYSTEMS FOR COMBINED CYCLE - TÉCNICAS REUNIDAS (BANGLADESH)

CONTROL AND PROTECTION SYSTEMS FOR COMBINED CYCLE - TÉCNICAS REUNIDAS (BANGLADESH)

Development, installation, testing and commissioning of control and protection systems for the combined cycle plant in Blangladesh.

References by Sector

SCADA - Operation Control Center

Rail Sector

Airports

Industry and Energy

Representative Buildings

We use our own and third-party cookies to obtain statistical data on our users' browsing and to improve our services. If you accept or continue browsing, we consider that you accept its use.